Residential house Construction Service in Bangalore

Timely Delivery

Our Projects will be handed over on time as per the given schedule. If there is any delay in handover, we pay a penalty for every day we delay.

No Subcontracting

Architecture, Structural, Construction, Electrical, Plumbing, Interiors - Complete in-house team with no subcontracting

No Hidden Charges

One lump sum cost till the completion and handover of the project.

Construction Guarantee

1 year construction guarantee and 15 years structural warranty

Silver package

--- Rs 1750 per sqf ---
DESIGN & DRAWINGS

2D Floor plan, Structural design, Basic 3D Elevation, Electrical drawings and plumbing Drawings

Steel – A-one gold/ RD or Equivalent Branded TMT Rebars.550 FE

Aggregates – 20mm & 40mm

Blocks – Standard Solid Concrete blocks 6 inches /4 inches

Cement – Zuari /Ramco/ penna or equivalent Branded – 43 & 53 Grade

RCC Design mix as per Structural engineering Design standards

M – Sand for Block work & P-sand for Plastering

Dr. Fixit Waterproofing

Ceiling Height – 10 feet

Slab Thickness 5inch

Parapet wall 3 Feet

Foundation – Foundation of 5 feet height from the earthwork

Main Door – Indian or Burma teak door with a teak frame of 5 inches by 3 inches, worth Rs.20000 including fixtures.

Internal Doors – Engineered Door with Neem or Laminate doors of 4-inch by 3-inch frame up to ₹10000 including fixtures

Windows – UPVC windows with glass shutters and mesh shutters (3 tracks with 1 mesh)

Puja Room – Teakwood frame & shutter @ Rs.10000

Ceramic Wall Tiles

2 feet above kitchen slab – Up to ₹50 per Sqft

Main Sink Faucet – Up to ₹2000 Any Other Faucet and other accessories – Branded ISI-recognized

Kitchen Sink – Stainless steel Sink up to 4000 (Futura/Carysil)

Kitchen Granite 20 mm thick – Up to ₹200 per Sqft

Bathroom Ceramic Wall Tiles with 7 feet height – Up to ₹50 per Sqft

Sanitary ware & CP Fittings – 20000/ Bathroom

PVC and CPVC Pipe – Hindware / Supreme / Finolex/Rolex

Bathroom doors – WPC doors

Bathroom Accessories – WC Wall mount, WC Flush System, Wash Basin, Wall Mixer, Spout, Health Faucet,
Pillarcock, Showerhead

Living and Dining Flooring – Tiles of value up to ₹60 per sqft

Rooms and Kitchen Flooring – Tiles up to ₹60 per sqft

Balcony and Open Areas Flooring – Anti-skid tiles of value up to ₹40 per sqft

Staircase Flooring – Basic Granite of value up to 70 per sqft

Parking Tiles – Anti-skid tiles of value up to ₹40 per sqft

Wires – Fireproof wires by finolex

Switches & Sockets – GM / Roma

Connections, point

Interior Painting – Internal Primer & Paint (1 coat + 2 Coats) NIPPON, BERGER (Tractor emulsion)

Exterior Painting External Primer & Paint (1 coat+2 Coats) NIPPON, BERGER (ACE emulsion)

Overhead Tank – Triple Layered 1000 ltrs | Staircase Railing – MS Railing

Window Grills – Basic MS Grills with Enamel Paint at ₹150 per sqft

Gold package

--- Rs 1950 per sqf ---
DESIGN & DRAWINGS

2D Floor plan, Structural design, Basic 3D Elevation, Electrical drawings and plumbing Drawings

Steel – JSW/ INDUS/ Equivalent Branded TMT Rebars.550 FE

Aggregates – 20mm & 40mm

Blocks – Standard Solid Concrete blocks 6 inches * 4 inches

Cement –Birla /ACC/Ultratech Branded – 43 & 53 Grade

RCC Design mix as per Structural engineering Design standards

M – Sand for Block work & P sand for Plastering

Dr. Fixit Waterproofing

Ceiling Height – 10 feet

Slab Thickness 5inch

Parapet wall 3 Feet

Foundation – Foundation of 5 feet height from the earthwork

 Main Door – Burma teak door with a teak frame of 5 inches by 3 inches, worth Rs.40000 including fixtures

 Internal Doors – Engineering Door with white Sal/Weener of 4-inch by 3-inch frame up to ₹12000 including fixtures

 Windows –UPVC windows with glass shutters and mesh shutters (3 tracks with 1 mesh)

 Puja Room – Teak wood door and Frame up to 15000

 Ceramic Wall Tiles

 2 feet above kitchen slab – Up to ₹80 per Sqft 2

 Main Sink Faucet – Up to ₹4000 Any Other Faucet & Accessories – Jaguar/Parryware/Hindware

 Kitchen Sink – culture marble Single Sink up to 8500 / Single Stainless-steel sink

 Kitchen Granite 30 mm thick – Up to ₹300 per Sqft

Bathroom Ceramic Wall Tiles with 7 feet height – Up to ₹80 per Sqft

 Sanitary ware & CP Fittings Rs.30,000/ Toilet

 PVC and CPVC Pipe – Hindware / Ashirwad / Finolex/Rolex

 Bathroom doors – Waterproof flush / WPC doors

 Bathroom Accessories – WC Wall mount, WC Flush System, Wash Basin, Wall Mixer,
Spout, Health Faucet, Pillarcock, Showerhead

Living and Dining Flooring – Tiles or Granite of value up to ₹90 per sqft

 Rooms and Kitchen Flooring – Tiles up to ₹90 per sqft

 Balcony and Open Areas Flooring – Antiskid tiles of value up to ₹70 per sqft

 Staircase Flooring – Sadarahalli Granite of value up to 100 per sqft

 Parking Tiles – Anti-skid tiles of value up to ₹70 per sqft

Wires – Fireproof wires by Finolex or Equivalent brand

 Switches & Sockets – GM / Legrand

 Connections, points provided for UPS points wherever required

 Interior Painting – Internal Primer & Paint (1 + 2 Coats) ASIAN (Premium emulsion)

 Exterior Painting – Asian Primer + External Primer & Paint (1+2 Coats) ASIAN (Apex)

Overhead Tank – Sintex Double Layered 2000 ltrs | Staircase Railing – Basic SS Railing

 Window Grills – Basic MS Grills with Enamel Paint at ₹170 per sqft | Underground sump with tiles 9000 litres

Platinum Package

--- Rs 2150 per sqf ---
DESIGN & DRAWINGS
  • 2D Floor Plan, 3D Modelling, Advanced 3D Elevation, Electrical and Plumbing Drawings, 3D Interior Furniture Design

Steel – JSW or Equivalent Branded TMT Rebars.550 FE

 Aggregates – 20mm & 40mm

 Blocks – Standard branded Solid Concrete blocks 6 inches * 4 inches

 9-inch red brick wall

 RCC Design mix as per Structural engineering Design standards

 Cement –Birla/ACC/Ultra tech Branded – 43 & 53 Grade

 M – Sand for Block work & P-sand Plastering

 Dr. Fixit Waterproofing

 Ceiling Height – 10 feet

 Slab Thickness 5inch

 Parapet wall 3 Feet

 Foundation –foundation of 5 feet height from the earthwork

  • Main Door – Burma teak door with a teak frame of 5 inches by 3 inches, worth Rs.40000 including fixtures

    Internal Doors – Engineering Door with white sal of 4-inch by 3-inch frame up to ₹15000 including fixtures

     Windows –UPVC windows with glass shutters and mesh shutters (3 tracks with 1mesh).Or Basic wooden windows up to 450/sqft

     Puja Room – Teak wood door and Frame, Worth 30000

Ceramic Wall Tiles

 2 feet above kitchen slab – Upto ₹80 per Sqft

 Main Sink Faucet – Up to ₹4000 Any Other Faucet & Accessories – Jaquar/Parryware/Hindware

 Kitchen Sink – culture marble Single Sink up to 8500 / Single Stainless-steel sink

 Kitchen Granite 30 mm thick – Up to ₹350 per Sqft

  • Bathroom Ceramic Wall Tiles with 7 feet height – Up to ₹50 per Sqft
  • Sanitary ware & CP Fittings – 20000/ Bathroom
  • PVC and CPVC Pipe – Hindware / Supreme / Finolex/Rolex
  • Bathroom doors – WPC doors
  • Bathroom Accessories – WC Wall mount, WC Flush System, Wash Basin, Wall Mixer, Spout, Health Faucet, Pillarcock, Showerhead

Living and Dining Flooring – Tiles or Granite of value up to ₹250 per sqft

 Rooms and Kitchen Flooring – Tiles up to ₹120 per sqft

 Balcony and Open Areas Flooring – Antiskid tiles of value up to ₹60 per sqft

 Staircase Flooring – Sadarahalli Granite of value up to 110 per sqft

 Parking Tiles – Anti-skid tiles of value up to ₹70 per sqft
Terrace Clay Tiles @ Rs.35 / Sqft

Wires – Fireproof wires by Finolex or Equivalent brand

 Switches & Sockets – GM Modular / Legrand

 Connections, points provided for UPS points where ever required

Interior Painting – Internal Primer & Paint (1 + 2 Coats) ASIAN (Royale Emulsion)

 Exterior Painting – External Primer & Paint (1+2 Coats) ASIAN (Ultima)

 Overhead Tank – Sintex Triple Layered 2000liters |

Staircase Railing – SS Railing
Window Grills – Basic MS Grills with Enamel Paint at ₹200 per sqft| Underground sump with tiles 10000 litres
Elevation cladding stone 150 Sft upto Rs.200 / sqft

Why Choose Sri Construction

Money Safety
We have micro stages that help customers to pay in smaller amounts.
Dedicated Team
Dedicate A separate Team of Experts will be allocated to handle the site till end
Quality Guaranteed
Our Engineers will perform 310 Quality Checks
No Delays
We work on the Schedules and will be delivered

We Provide Quality House Construction in Bangalore

289+

Delivered Units

310+

Quality Checks

100%

Transparency

deepak pl
⭐⭐⭐⭐⭐

Good service, On-time, on-budget, and high-quality results.
From start to finish, the team at Sri Construction Services was fantastic. They were always punctual, respectful of our property, and kept us informed throughout the entire process. 

Geetha Santosh
⭐⭐⭐⭐

Building our dream home in Bangalore was a journey that we’ll never forget. Sri construction Services brought our vision to life beautifully! Watching the house come to life, brick by brick,was an incredible experience.

Pralhad Joshi
⭐⭐⭐⭐

Our experience with Sri Construction was above and beyond our expectations. They made everything so easy. The representative was so impressive . The solution to all aspects like home loans etc. 

Srinivas Mudaliyar
⭐⭐⭐⭐⭐

Sri Realty was my choice for construction. They are good, they pay attention to details, they take your input and also budget friendly.
They take utmost care into building your dream home well within your time constraints keeping quality in mind.

Narayana Rao
⭐⭐⭐⭐

Sri construction is one of the best.. we given contract for the full building i suggest them to handle interior works too.. we got best deal and reasonable price.. im wishing all the best for their future projects and plans rohit sir is gentle man helped us .

Anirban Chakraborty
⭐⭐⭐⭐

Very helpful and good at their work

How it works

House Construction Costs in Bangalore

Our house construction steps are simple and easy to understand: Plan – Build – Track – Settle in.

Brief Overview of the Importance of Understanding House Construction Costs in Bangalore

As a centre of technological innovation, Bangalore has seen a lot of social progress since the IT revolution. Now, in 2025, the realty industry in the city is flourishing, which makes it an ideal time to build a 1 BHK apartment or 2 BHK apartment independently. House construction costs in Bangalore range anywhere between Rs 1650 to Rs 3000 per sq. ft approximately. However, constructing a house in the metropolis comes with a lot of financial implications, including taxes and charges. The city’s international infrastructure adds to its higher costs. Government agencies play a crucial role, as they require registration fees and stamp duty when buying property. After the COVID-19 pandemic, a rise in material costs is a major obstacle for those who want to build their dream home in Bangalore.

Per Sq Ft Construction Cost in Bangalore:

Known as India’s ‘Silicon Valley,’ Bangalore is attracting a lot of IT professionals who are looking for jobs and want to build low-cost houses in the city. Apart from the city’s serene and pleasant climate and its rich culture, almost every plot of land is occupied. The high demand of residential or home developments means that the construction costs in Bangalore per square foot are quite high. The average building cost in Bangalore per square foot ranges between Rs 1500 and Rs 1700, depending on your preference. However, if the site you want to build is located in an attractive area, the cost may increase even more. A recent survey revealed that the majority of housing or home development properties located in the Central Business District of Bangalore (CBD) have seen an increase in value between Rs 2500 and Rs 3500 per square foot in a short period of time.

Factors Affecting House Construction Cost in Bangalore

K/W Used – Bangalore construction cost trends, factors influencing construction expenses.

Bangalore, known for its rapid urbanization and tech-driven growth, has seen a consistent rise in construction activity. However, Bangalore construction cost trends have shown significant variation, influenced by multiple factors. Whether you’re planning to build a simple home or a luxury villa, understanding these factors is crucial for efficient budgeting.

One of the primary factors influencing construction expenses in Bangalore is land cost. The city’s popularity has driven up land prices, particularly in prime areas like Whitefield,Indiranagar,JayaNagar,Malleshwaram and Koramangala. The location of your property will significantly impact overall construction costs.

Material costs also play a pivotal role. The prices of essential materials such as cement, steel, and sand have fluctuated due to demand, supply chain challenges, and inflation. High-quality materials may cost more but ensure durability and long-term savings. Labour charges are another critical element. Skilled labour costs in Bangalore are relatively higher compared to other cities, especially for experienced architects, engineers, and contractors.

The design and complexity of the house also affect costs. A simple, functional design will naturally cost less than a custom, intricate layout. Additionally, the choice of flooring, paint, and fixtures can escalate expenses.

Finally, regulatory approvals and compliance with local building codes can add to the budget. Permissions for construction, water, and electricity connections often involve fees and time delays, further influencing costs.

Staying updated with Bangalore construction cost trends and carefully analyzing the factors influencing construction expenses can help you make informed decisions. With proper planning, you can balance quality and affordability while building your dream home in this bustling city.

Top Ways to Reduce House Construction Costs in Bangalore

K/W Used – Affordable house construction in Bangalore, budget-friendly building tips in Bangalore

Building a home in Bangalore can be a costly endeavor, but with strategic planning, you can significantly cut expenses without compromising on quality. By following budget-friendly building tips in Bangalore, homeowners can save both time and money.

One of the most effective ways to achieve affordable house construction in Bangalore is by selecting the right plot. Opt for locations in emerging neighborhoods rather than prime city areas to save on land costs. Ensure the land is construction-ready to avoid additional expenses for leveling or legal compliance.

Choosing cost-effective construction materials is another key strategy. Instead of premium brands, opt for locally sourced, high-quality materials that offer durability at a lower price. Recycled or eco-friendly materials such as fly ash bricks or hollow concrete blocks can also help reduce costs.

Efficient design planning plays a crucial role in controlling expenses. Simple and functional designs with a focus on space optimization reduce both material and labour costs. Avoid unnecessary architectural complexities, which can significantly increase construction time and expenses.

Additionally, focus on energy-efficient solutions during construction. Using natural lighting, proper ventilation, and solar panels can lower long-term operational costs.

By incorporating these budget-friendly building tips in Bangalore, you can ensure a seamless construction process that fits your budget. Staying informed and flexible while making decisions is key to achieving affordable house construction in Bangalore. With the right approach, building your dream home in this vibrant city is both feasible and economical.

House Construction Approval Cost in Bangalore in BBMP & BDA Jurisdictions

Budgeting for house construction involves more than just allocating funds for materials and land. An essential part of the process is earmarking approximately 10% of the budget for administrative expenses, including obtaining plan approvals from the BBMP (Bruhat Bengaluru Mahanagara Palike). It is important to note that budgeting provides an estimated figure for your total expenditure, not an exact amount.

For homeowners in Bangalore, acquiring permits from local authorities like BBMP and BDA (Bangalore Development Authority) is mandatory. The Bangalore building plan approval fees and associated administrative costs vary depending on the size and type of construction. These approvals cover essential steps such as plan sanctions, paperwork, and compliance with local regulations.

For a standard 40×60 house construction, the construction permits cost Bangalore 2024 depends on the number of floors planned. For a ground floor plus one (G+1) design, the approval cost ranges between ₹80,000 and ₹1,00,000. For houses with G+2 floors, it typically increases to ₹2.5–3 lakh. Larger constructions, such as G+3 floors, may require an approval budget of ₹3–5 lakh.

These costs also include obtaining permits from various departments for utilities like water, electricity, and sewage connections. Navigating this complex process can be daunting, but professional services like Sqft.expert can simplify it. Our experts assist with plan approvals, paperwork, blueprints, and obtaining necessary documents from government agencies such as BBMP and BDA.

Understanding Bangalore building plan approval fees and the construction permits cost Bangalore 2024 is critical for efficient project planning. Proper allocation of funds for these expenses ensures smooth execution of your construction project while staying compliant with local regulations.

What is the Foundation Cost Involved in Constructing a House in Bangalore?

This is the most important and essential part of laying the foundation of your house. First, you should identify the place where you would like to build your home. You should always choose the place that best suits your housing needs. The foundation cost of house construction in Bangalore includes not only the estimated house building cost, but also the cost for obtaining the clearance of the housing authorities, as well as the fees for the structural design and the architect services. This is illustrated by an example that is listed below.

Here are some rough estimates: Foundation cost as a percentage of total construction cost: 15-20%. For example, let’s say you want to build a 1-storey house in Bangalore. You’ll need to provide and construct the foundation, earthwork and excavation, layering and curing concrete, substructure masonry (SSM) and roofing (base and concrete for columns). In this example, you can see that the total cost of building a 1-storey residential house in Bangalore would be around Rs. 25 lakhs. For example, imagine you need to furnish, excavate, and lay out concrete on a site of 1200 sq ft in Bangalore. The cost of this site would be ₹20,960. The cost of providing and laying concrete (footing, column, plinth beams, etc. will be ₹36,825. The cost of steel structure (footing, columns, pillar beams, base and concrete) will amount to ₹74,390. The total foundation cost will be approx Rs. 2,77,691. It is important to note that these estimates may differ depending on the specifics of the project and other factors. To know more about the same, do consult our professionals who can assist you with giving suitable solutions with regard to house construction costs in Bangalore.

What is the Base Cost Involved in Construction Cost in Bangalore?

The base cost of construction in Bangalore is influenced by numerous factors such as land price, material quality, labour charges, and legal fees. While the exact cost can vary widely, a rough estimate ranges from ₹1,500 to ₹3,000 per square foot for standard residential construction, depending on the specifics mentioned above.

For a more accurate estimation, it’s advisable to consult our professionals at Sqft.expert who can provide detailed insights based on current market conditions.

Cost of Building a House in Bangalore:

It is almost impossible to give you a precise figure to show you the construction costs per square foot in Bangalore, but we can give you a rough estimate for the following costs:-

  • Foundation – Laying a foundation is a multi-step process and therefore the costs are also multi-step. The expected expenditure includes excavation costs, concrete layer and curing costs and other costs associated with technical construction. Since the earthwork excavation process is mostly labour-intensive, based on the construction labour rate in Bangalore, you can expect to spend around Rs.22,000. All other costs of construction, including raw materials and labour, would add up to around Rs 1.90 lakh. This would bring the total cost to around Rs 2.12 lakh.
  • Steel Structure – The steel structure will consist of the footing, a column and a plinth structure. This part of home construction is estimated to cost up to Rs. 55,000  including material and labour costs.
  • Roofing – The roof is one of the most important structural elements of your home. You have to make sure that the roofing process is carried out correctly and that there are no corners cut. The roofing process will include the base laying, the installation of the columns, the installation of beams, the installation of slabs, the installation of lintels, the installation of stairs, etc. The total cost of roofing materials and labour is estimated to be around Rs. 1,50,000.
  • Superstructure – It will cost another Rs. 1,50,000 approx that include material and labour costs as far as superstructure is concerned.
  • Walls – Walls with 4 and 6 inch thickness will cost around Rs. 1,30,000 considering the material contract rate in Bangalore. 
  • Tile Work – For a brand new house, a mixture of floor and wall tiles are required. Wall tiles will be used primarily in areas such as bathrooms and kitchen. If you opt for standard tiles, the total cost of materials and labour will be around ₹ 1,40,000.
  • Woodwork – As wood is considered as an expensive material, essential house interior works like doors, windows, etc. will be on the higher side. This in turn will increase the prices as far as woodwork is concerned.
  • Painting – Painting is considered to be an integral part of house construction in Bangalore. The total cost of interior and exterior paint works, including the cost of raw materials and labour, can be as high as ₹ 1,00,00. Add in the additional costs of plastering, and the total cost increases to ₹ 2,90,000.
  • Electrical & Plumbing Work – The average approximate cost can reach ₹3,00,000 that depends on the type of brand, wiring, lighting or plumbing fixtures that you choose.

Installation of Lift Unit and the Associated Costs in Bangalore:

When adding a lift to a house or an apartment in Bangalore, there are a few things to consider, including the installation process and associated costs. Here’s a simple breakdown:

Installation Process:

  • Site Inspection: A technician will visit your house to assess the space and determine the feasibility of installing a lift.
  • Design and Planning: Based on the inspection, a customised design will be created to fit the lift into your house or an apartment area that is specifically designated for lift installation.
  • Preparation: Before installation, any necessary structural modifications will be made to accommodate the lift.
  • Installation: The lift will be installed according to the design, including wiring, assembly, and testing.
  • Certification: Once installed, the lift will undergo safety inspections and certification to ensure it meets all safety standards.

Associated Costs:

  • Lift Equipment: The cost of the lift itself varies depending on factors like size, capacity, and features (e.g., automatic doors, emergency buttons).
  • Installation Charges: This includes labour costs for technicians to install the lift, as well as any structural modifications required.
  • Electrical Work: Wiring and electrical connections are needed for the lift to operate, so electrical work will incur additional costs.
  • Permit Fees: You may need to obtain permits from local authorities, which could involve fees.
  • Maintenance: Ongoing maintenance costs to keep the lift in good working condition should also be budgeted for.

Overall the total cost for installing a lift unit will range from ₹ 4,00,000 to 6,00,000, with the most expensive units costing up to ₹ 15,00,000.

The Construction of a Home in Bangalore Requires a Lot of Labour:

Constructing a home in Bangalore needs a lot of labour, which means people working hard to build it. Here’s why:

  • Building from Scratch: When you’re making a house, there’s a lot to do. From digging foundations to putting up walls and fixing the roof, every step needs people to work on it.
  • Skilled Workers: You need different kinds of workers with skills like masonry, carpentry, plumbing, and electrical work. Each of these jobs requires trained people who know what they’re doing.
  • Manual Work: Much of the work involves using hands and tools. For example, digging trenches for pipes, laying bricks, installing windows and doors—all these tasks need hands-on work.
  • Team Effort: Building a house is not a one-person job. It takes a team of workers coordinating together. Each person has their roles and responsibilities and they all work together to get the job done.
  • Time and Effort: Constructing a home is not a cup of tea. It takes time and a lot of effort. Workers often spend long hours on-site, especially when deadlines are tight.
  • Attention to Detail: Every part of the construction process needs attention. Whether it’s measuring and cutting materials or ensuring everything is level and straight, it all requires careful workmanship.

In Bangalore, like in many places, building a home is a labour-intensive process. It relies on the skills and hard work of many individuals coming together to create a safe and comfortable living space. Work costs are a major part of your budget. Due to the fact that Bangalore is an urban area, construction labour costs are very high in Bangalore and it varies from Rs. 280 – Rs. 320 per sq. ft. The amount of labour costs will depend on the completion of the project; if the project has specific features, then more qualified labour will be needed, which will add to the total cost of the project.

Average Labour Costs

As of 2025, the following are typical daily wage rates for various types of construction labour in Bangalore:

Unskilled Labourers: ₹500 – ₹700 per day

Semi-Skilled Labourers: ₹700 – ₹1,000 per day

Skilled Labourers

Masons: ₹1,000 – ₹1,500 per day

Carpenters: ₹1,200 – ₹1,800 per day

Electricians: ₹1,200 – ₹1,800 per day

Plumbers: ₹1,200 – ₹1,800 per day

Painters: ₹1,000 – ₹1,500 per day

These rates can vary based on the specific project requirements, the reputation and expertise of the workers in different locations in Bangalore.

Breakdown of Labour Costs in House Construction

Labour costs constitute a significant portion of the total house construction expenses in Bangalore. On average, labour costs can account for 30% to 40% of the total construction cost. For example, if the overall construction cost of a house is estimated to be ₹50 lakhs, the labour costs might range from ₹15 lakhs to ₹20 lakhs. Below given is the breakdown of labour costs incurred for house construction in Bangalore.

Foundation Work: This includes excavation, laying the foundation, and building the plinth. Labour costs for this stage can range from ₹2,00,000 to ₹3,00,000 depending on the soil condition and complexity.

Structural Work: This includes building the walls, roofing, and basic framework. Labour costs for structural work can vary widely, typically between ₹5,00,000 to ₹8,00,000.

Finishing Work: This stage involves plastering, flooring, tiling, painting, and installation of fixtures like doors and windows. Labour costs for finishing work can be around ₹3,00,000 to ₹5,00,000.

Electrical and Plumbing: These are specialised jobs and can add another ₹2,00,000 to ₹3,00,000 in labour costs.

House Construction Costs in Bangalore – A Detailed Chart

(Kindly note that the construction costs given below are a rough estimate costs and not the actual costs)

The Influence of Timing on Home Construction Costs in Bangalore:

The timing of home construction in Bangalore can have a big impact on the cost. Here’s how:

  • Material Prices: The cost of materials like cement, steel, and bricks can change depending on the time of year. During peak construction seasons, when demand is high, prices may go up. So, building during these times can be more expensive.
  • Labour Availability: Sometimes, there might be a shortage of construction workers in certain seasons. When there aren’t enough workers available, their wages may increase, which can drive up construction costs significantly.
  • Weather Conditions: Bangalore experiences different weather patterns throughout the year. Rainy seasons, for example, can slow down construction progress, leading to delays and increased costs. It might also require additional measures to protect the construction site from the weather.
  • Government Regulations: Construction projects need permits and approvals from local authorities. Sometimes, there could be changes in regulations or delays in getting permits, which can affect the project timeline and costs.
  • Market Conditions: The real estate market in Bangalore can fluctuate. During times of high demand, construction costs may rise due to increased competition for resources and skilled labour.
  • Inflation: Over time, prices for materials and labour tend to increase due to inflation. So, delaying construction could mean higher costs in the future.

Considering these factors, timing is important when planning the construction of a home in Bangalore. It’s essential to assess the market conditions, weather forecasts, and other factors to optimise costs and ensure a smooth construction process

Before starting the construction you need to know Step by Step House Construction Process

Architect’s Fee and Need for Clarity:

When building a house in Bangalore, hiring an architect is common to help with design and planning. Here’s why understanding their fees is crucial:

Architects’ fees for house construction in Bangalore can vary depending on several factors such as the complexity of the project, the reputation and experience of the architect, and the size of the house. Here’s a simple breakdown:

For more modern single floor house design  there are 10 different designs to choose from.

How Fees are Charged?

  • Percentage of Construction Cost: Many architects charge a percentage of the total construction cost. This percentage can range from 5% to 15%, depending on the project. For a typical residential project, it’s often around 7% to 10%.
  • Fixed Fee: Some architects might offer a fixed fee for their services. This can be a good option if the project scope is clearly defined and unlikely to change.
  • Per Square Foot: Another method is charging based on the size of the house, usually per square foot. Rates might range from ₹150 to ₹300 per square foot or more, depending on the complexity and requirements of the project.

What is Included in the Fee:

Architects’ fees usually cover several stages of the project:

  • Concept Design: Initial sketches and ideas based on your requirements.
  • Design Development: More detailed plans and 3D models.
  • Construction Drawings: Detailed drawings required for construction.
  • Project Management: Overseeing the construction process to ensure it meets the design specifications.

Additional Costs

  • Consultation Charges: Some architects may charge for initial consultations.
  • Site Visits: Regular site visits to monitor progress may incur additional charges.
  • Special Services: Additional services like interior design, landscape design, or sustainable building practices might cost extra.

Example for Calculation of an Architects Fees in Bangalore:

If your house construction cost is estimated at ₹50 lakhs:

At 10%, the architect’s fee would be ₹5 lakhs.

If charged per square foot for a 2000 sqft house at ₹200 per sqft, the fee would be ₹4 lakhs.

Factors That Affect House Construction Cost in Bangalore:

While there are many factors that can influence the cost per square foot of construction in Bangalore, here are a few of the most common ones:

  • Materials Cost
  • House Construction Materials

Constructing a house requires several materials including cement which is the backbone of any construction. To know how many bags of cement are required for 1M3 concrete, you can refer How Much Cement and Sand are Required for 1sqm of Plastering

  • Foundation – There are different types of foundations are there
  • Types of Pile Foundation and their Use in Construction
  • Duration of the project
  • Site location
  • Site cost
  • Registration & stamp duty charges
  • Interior design requirements
  • If you want to give your a home classy look especially for living room with PVC wall panels, then you come to Modern PVC Wall Panel Designs. Here you can select the top 10 PVC wall panels for living rooms that will make your living room look stylish as well as elegant.
  • If you are more concerned about your privacy, then there are 15 different types of partition walls to choose from as per your preference and budget. To know more about it you can check out at 15 Best Different Types of Partition Walls
  • Architects fee and charges
  • Labour charges
  • Costs of equipments
  • Doors – House construction requires several types of woods for making doors and windows. So to know more about the types of woods used and their estimated cost you can visit the link Teak Wood and Types
  • House construction comes with standard room sizes for living rooms, bedrooms, kitchen, and master bedrooms and so on. To know further about this you can check them out on Standard room sizes
  • Cost incurred towards house insurance
  • Modern Gate Designs
  • You can check out the modern gate design trends. Here there are more gate designs and you can pick the one that you like.
  • Overhead Water Tanks
  • If you are concerned about how to store the water in your overhead water tanks, you can go through the link 10 Best Water Tanks in India for House Owners that tells about the best overhead water tank manufacturers, shapes, and capacity
  • Tiles – You can click on the link to know about the Top 10 Tiles Company in India
  • Cement – Cement make your homes stronger and durable. To know more about  it click here Top 10 Cement Companies in India
  • Bricks and Cement Blocks
  • Different types of bricks and cement blocks are used in the house construction. So to know more about it you can refer the link Brick vs cement blocks in masonry
  • Your home needs the best wires for added safety. To know more about the Top 10 wires, from the best makers you can check them on 10 Best Wire Company in India
  • If you are looking for the best switch brands in India  that can be used in your new home, then you can refer at Best Switch Brands in India
  • Wall Putty – To know about the best wall putty in India, refer Best Wall Putty Brands in India

There are many things to consider when constructing and designing your dream house in India’s Silicon Valley. Apart from the construction costs in Bangalore, there are many other factors to consider when constructing your dream house in Bangalore. If you want to consult a professional before going ahead with the construction of your 1 BHK or 2 BHK house in Bangalore, you are sure to get the right help from Sqft.expert who are always at your service and will assist you with house construction costs in Bangalore at every step.

Ways to Mitigate Unexpected Cost Overruns or Delays:

Mitigating unexpected cost overruns or delays is crucial for successful house construction projects in Bangalore. Here are some effective strategies to address these challenges:

  • Comprehensive Planning: Conduct thorough planning and feasibility studies before initiating the construction project. Anticipate potential risks and uncertainties, such as adverse weather conditions, labour shortages, or regulatory delays, and develop contingency plans to mitigate their impact.
  • Risk Management: Implement robust risk management practices to identify, assess, and mitigate project risks proactively. Regularly monitor project progress and performance indicators to detect early warning signs of potential cost overruns or delays and take corrective action promptly.
  • Clear Communication: Establish clear lines of communication and collaboration among project stakeholders, including architects, contractors, suppliers, and regulatory authorities. Maintain open and transparent communication channels to address issues, resolve conflicts, and ensure alignment with project objectives and timelines.
  • Contractual Clarity: Ensure that all contractual agreements, including scope of work, pricing, timelines, and change-order procedures, are clearly defined and documented in writing. Establish mechanisms for managing changes or deviations from the original contract to minimise disputes and avoid unexpected costs.
  • Contingency Budgeting: Allocate a contingency budget to cover unexpected expenses or unforeseen circumstances that may arise during the construction process. Set aside a portion of the total project budget as a buffer to address cost overruns, delays, or unforeseen changes without jeopardising project viability.
  • Regular Monitoring and Reporting: Implement robust project management systems and reporting mechanisms to track project progress, expenditures, and performance indicators regularly. Monitor key milestones, critical path activities, and budget variances to identify potential risks or deviations from the planned schedule and take corrective action as needed.
  • Adaptability and Flexibility: Maintain flexibility and adaptability to respond to changing circumstances, market conditions, or stakeholder requirements. Be prepared to adjust project plans, timelines, or resource allocations as needed to accommodate unforeseen changes or mitigate risks effectively.

By implementing these strategies, stakeholders can minimise the impact of unexpected cost overruns or delays and ensure the successful completion of house construction projects in Bangalore within budget and schedule constraints.

Planning House Construction Costs in Bangalore

Managing house construction costs in Bangalore requires careful planning, effective communication, and strategic decision-making to navigate the unique challenges posed by the dynamic construction landscape. From fluctuating material prices to labour shortages and regulatory complexities, stakeholders must be proactive in addressing potential risks and uncertainties to ensure project success. Ultimately, successful house construction projects in Bangalore require a collaborative and proactive approach from all stakeholders involved. By prioritising transparency, communication, and strategic planning, stakeholders can navigate the complexities of construction costs and deliver projects that meet quality standards, budget constraints, and timelines effectively.

Managing house construction costs in Bangalore is a multifaceted endeavour that demands careful consideration of various factors, including material prices, labour availability, regulatory requirements, and market dynamics. By employing effective strategies, fostering collaboration, and embracing innovation, stakeholders can mitigate risks, optimise resources, and achieve successful outcomes in the vibrant and evolving construction landscape of Bangalore.